TERUNOBU FUJIMORI TEA HUT WORKSHOP NO.10 March 23, 2018 Top roof arrived and we are putting stripe plaster inside the top roof. The bottom roof is done and ready to recieve the top roof. Now we are putting the top roof. It is on a rail and it slides open!!!!